Uleila del Campo will recover 5,000 square metres of its landfill
Topics Consejería de Sostenibilidad y Medio Ambiente
The Regional Government puts out to tender for 991,417.62 euros the sealing and environmental restoration of the inert waste landfill in Uleila del Campo, with ten months of works planned.
AndalucíaYa newsroom ·
The former inert waste landfill in Uleila del Campo (Almería) will once again be a recovered space. The Junta de Andalucía has put out to tender the sealing and environmental restoration works for this site, which will allow a surface area of 5,000 square metres to be recovered.
The base tender budget is 991,417.62 euros, charged to the Andalucía FEDER 2021-2027 Programme, and the planned execution period is ten months. All the information on the call is available at the tender for the works.
What will be done at the site
The works aim to reduce the environmental and health risks of the landfill, strengthen the stability of the terrain and prevent damage to the surroundings, such as erosion caused by runoff. To this end, the deposited waste will be sealed in accordance with the technical project and regional, state and European regulations.
The works include a perimeter fence, improvement of the access road, cleaning and conditioning of the disposal cell and the regularisation of the waste to give the terrain more stability. Sealing layers will also be installed, drainage at the head of the slopes will be conditioned with perimeter ditches and a riprap wall will be built.
The restoration will be completed with the planting of native species to integrate the space into the landscape, together with monitoring of the evolution of the recovered area.
Thirty years of monitoring
When the sealing and closure works are completed, an Environmental Monitoring and Control Plan of at least 30 years will be launched, the responsibility for which will fall to the Ayuntamiento de Uleila del Campo. This plan will supervise the long-term behaviour of the landfill and verify the effectiveness of the protection measures, with special attention to the stability of the surfaces and possible effects on water and natural and cultural assets.
The landfill is about four kilometres south of the town centre, with access from the AL-1100 road, and covers an approximate area of 0.5 hectares. It has two zones: the Talud Oeste, which received the first deposits and where a slope about nine metres high was generated, and the Talud Este, located in a hollow and with the largest volume of waste. The top platform covers about 1,381 square metres and the landfill slope about 1,970, with a difference in level of up to 18 metres.
The action has been put out to tender by the Consejería de Sostenibilidad y Medio Ambiente, as reported by the Junta.
Breaking news from News, on your phone
An alert only when something can't wait. Free, no account needed.
On iPhone, alerts only arrive if you first add AndalucíaYa to your Home Screen. How to do it, step by step
This browser can't receive alerts. Try another one, such as Chrome or Safari.
You've blocked alerts from AndalucíaYa in this browser. You can turn them back on in its settings. How to do it, step by step
Only what can't wait. Change or remove it in my alerts
Shall we let you know what matters?
Phone alerts
On iPhone, alerts only arrive if you first add AndalucíaYa to your Home Screen. How to do it, step by step
This browser can't receive alerts. Try another one, such as Chrome or Safari.
You've blocked alerts from AndalucíaYa in this browser. You can turn them back on in its settings. How to do it, step by step
