29-N general election in Andalucía How to vote, the calendar and every result since 1977

La Junta awards 50 protected homes in El Perchel for 7.1 million

Topics AVRA

The Andalusian Housing and Rehabilitation Agency will build 50 protected-sale flats on Cerrojo street, with 18 months of works.

AndalucíaYa newsroom ·

Un solar con hierba seca y escombros junto a un alto muro de ladrillo y edificios de viviendas al fondo.
Photo: Junta de Andalucía · Portavoz
The Málaga neighbourhood of El Perchel will have 50 new protected homes. The Regional Government of Andalusia has awarded for 7,115,209 euros the works to build them at number 28 of Calle Cerrojo, between Fuentecilla and Agustín Parejo, as reported by the Department of Housing, Youth and Territorial Planning. The development is for sale under the general regime and will have parking spaces and storage rooms linked to each home. By size, three flats will have one bedroom, 40 will have two and seven will have three. Two of the ground-floor homes will be adapted for people with reduced mobility. The building will have 2,954 square metres of usable housing space, 1,504 for garages and 186 for storage rooms. Access will be from Calle Cerrojo and Calle Agustín Parejo, and the parking and storage rooms will be located on the basement floor.

Aerothermal systems and solar panels in each home

All the homes will have an individual aerothermal system for hot water, with a high-efficiency heat pump and a 200-litre tank. The building will add a solar photovoltaic installation of 43 bifacial monocrystalline panels of 715 watts and a 630-kilowatt transformer centre. The Minister of Housing, Youth and Territorial Planning, Rocío Díaz, has stated that protected housing «must offer solutions adapted to the needs of families» and has defended that they be «accessible, efficient and have the necessary conditions to live in». The action is part of the direct promotion of affordable housing by the Andalusian Housing and Rehabilitation Agency (AVRA). The agency also works with the exchange of residential land for finished protected homes, with private developers, and with the development and urbanisation of sectors for new developments. The works have an execution period of 18 months from their start. Information on the purchase process for these homes corresponds to AVRA.

Shall we let you know what matters?

Phone alerts

Change or remove it in my alerts