29-N general election in Andalucía How to vote, the calendar and every result since 1977

The works on the Punta Umbría anti-swell barrier awarded for 1.8 million

Topics Regional Government of Andalusia

The Junta awards to Sedinfra the renovation of the barrier at the Punta Umbría marina, in Huelva, with eight months of work planned.

AndalucíaYa newsroom ·

Vista aérea de un puerto pesquero con barcos en el agua, naves azules, camiones y edificios de tejados rojos junto al muelle.
Photo: Junta de Andalucía · Portavoz
The anti-swell barrier at the Punta Umbría marina, in the province of Huelva, is going to be replaced. The Junta de Andalucía has awarded the works to the company Sedinfra for 1,727,987 euros, somewhat less than 1.8 million, as reported by the regional administration. The intervention will last eight months and will consist of replacing the modules of the current floating dock with others better suited to the conditions of the site. The basin suffers strong currents, a high tidal range and the swell generated by vessels passing through the channel. The fixing system is also being changed, which will now use driven metal piles. The new barrier is organised in three sections: 300 metres at the front, 48 metres to the northwest and 12 metres to the southeast. Each section is made up of modules 12 metres long moored to five-tonne sinkers. The aim is to improve navigability and the safety of the nautical-sports and fishing fleet operating in the port. The facilities occupy 163.2 hectares in water, 5.6 hectares on land and 14,200 square metres of boatyard.

A basin with 998 berths

In the fishing area, the port has a 415-metre berthing line, a 3,265-square-metre fish market and an ice factory with a capacity to produce 30 tonnes per day and store 70. Fish landed up to August 2026 amounts to 3.4 million kilos. The nautical-sports area has 267 directly managed berths, with an average occupancy of almost 84%. To these are added 471 berths managed by the Club Deportivo Náutico de Punta Umbría and 260 of the Real Club Marítimo y de Tenis de Punta Umbría. In total, 998 moorings. There is also a passenger boarding terminal with a 36-metre berthing line.

Shall we let you know what matters?

Phone alerts

Change or remove it in my alerts

What it's about Economy and employment